Sourcing hubs Services How it works FAQ Contact Request a quote
Indonesia · China · Malaysia · Europe

Global sourcing.
Simplified. Delivered.

We find the factory, check the goods and land the container. Furniture, lighting and decor from verified manufacturers — quoted as one landed price.

Every supplier audited before a single unit is made

0+
Verified factories on file
0
Countries sourced from
0+
Containers moved
0%
Pre-shipment pass rate
Factory audits before order AQL 2.5 inspection standard FSC & SVLK timber chain IEC-registered importer of record
What we do

One team from the first drawing to your loading bay

Most importers stitch together an agent, an inspector and a forwarder. We run all three, so nobody can point at anybody else when something slips.

Supplier discovery

We shortlist three factories that already make your product category, then verify registration, capacity and export history before you talk to any of them.

Quality control

Inline checks during production and a full AQL pre-shipment inspection with a photo report — reviewed and signed off before the balance payment leaves your account.

Freight & customs

Consolidation of several suppliers into one container, ocean or air booking, documentation, clearance and delivery to your door. One invoice, one landed cost.

Private label & OEM

Your drawing, finish and packaging produced under your own brand — with tooling, sampling and a written spec sheet the factory has to build against.

Sourcing hubs

Four regions, chosen for what each one actually does best

We do not pretend one country wins on everything. Here is what we buy where, and why.

IDN18 audited

Indonesia

Jepara, Solo and Bali. Teak and rattan craftsmanship with SVLK-legal timber, strongest on carved and woven furniture.

  • Best forTeak, rattan
  • Lead time45–70 days
  • MOQ1 × 20ft
CHN96 audited

China

Foshan, Guangzhou and Zhongshan. Unmatched for metal, glass and lighting, with the deepest component supply chain.

  • Best forLighting, metal
  • Lead time30–55 days
  • MOQMixed LCL
MYS21 audited

Malaysia

Muar and Klang Valley. Engineered and solid rubberwood at consistent quality, with the fastest sailing to west India.

  • Best forRubberwood
  • Lead time35–50 days
  • MOQ1 × 20ft
EUR34 audited

Europe

Italy, Poland and Portugal. Design-led pieces, premium finishes and certified components for hospitality projects.

  • Best forDesign, finish
  • Lead time60–90 days
  • MOQBy project
How it works

Six steps between your brief and your loading bay

You approve at every gate. Nothing moves to the next stage without your sign-off in writing.

STEP 01

Brief & specification

Send a photo, drawing or reference. We turn it into a written spec with materials, finish, packing and target cost.

STEP 02

Supplier shortlist

Three audited factories, compared on price, capacity and past export records. You pick one.

STEP 03

Sampling & costing

Physical sample shipped to you, plus a landed cost sheet covering freight, duty and handling.

STEP 04

Production & inline QC

Our inspector visits mid-run to catch finish and dimension drift while it is still cheap to fix.

STEP 05

Pre-shipment inspection

Full AQL check with a photo report. You release the balance payment only after you have read it.

STEP 06

Freight, customs, delivery

Booking, documents, clearance and last-mile delivery, tracked as one shipment on one invoice.

The numbers

What our last twelve months looked like

0
Containers shipped
0
Inspections carried out
0%
Average cost saved vs. first quote
0%
Clients who reorder
Client results

What buyers say after the second container

The inline inspection caught a finish problem on 300 chairs in week three. Fixing it there cost nothing. Finding it in Mumbai would have cost me the season.
RKR. Kapoor
Category head, furniture retail chain
We were quoting three vendors, three forwarders and a CHA. Now there is one landed cost sheet and one person who answers the phone.
SMS. Mehta
Procurement lead, hospitality group
They moved our lighting order from one factory to another after the audit flagged capacity. It landed on the original date anyway.
AVA. Verma
Founder, interior products brand
Questions

Before you send a brief

Still unclear on something? Ask us directly — we answer within one business day.

Talk to a sourcing manager

For a single supplier, one 20ft container is the practical floor. Below that we consolidate your order with other buyers into an LCL shipment, which works from roughly 3 CBM upwards.

Either a percentage of order value for full sourcing, or a flat fee per inspection and per shipment if you already have your own suppliers. Both are quoted before you commit, and both appear on the same landed cost sheet.

Yes. Plenty of clients bring their own supplier and use us only for inspection, consolidation and freight. We will still run an audit on that factory so we know what we are signing off on.

The container does not ship. We hold it, send you the report with photographs, and work the rework or replacement with the factory. Your balance payment stays with you until the re-check passes.

Yes, including HS classification, duty estimation, BIS and FSSAI checks where they apply, and delivery to your warehouse. You can also import on your own IEC and use us purely as origin-side agent.

Request a quote

Tell us what you need made

A photo and a rough quantity is enough to start. You will get three matched suppliers and an indicative landed cost within one business day.

Enter your name
Enter your company
Enter a valid email address
Choose a category
Pick an origin, or “Not sure yet”
Tell us briefly what you need
Attach drawings, images or a spec sheet
PDF, JPG, PNG or XLSX up to 20 MB each

We reply within one business day. Your files stay confidential and are never shared with a factory before you approve the shortlist.